Project |
Description
of Work |
Main
Contractor |
Consultant
/
Landscape Architect |
Client |
Contract
Sum |
Completion
Date
|
|
1 |
Contract No.: DC/99/01
- Drainage Maintenance and Construction in Mainland South Districts
(2000-2002)
Jordan Valley Nullah |
|
Toyo-Mulching
System on Sprayed Concrete Slope - 1,800 sq m
Geomat - 1,800 sq m
Eco-Bag
|
Hung Mau Realty
& Construction Ltd. |
Drainage Services
Department
|
Drainage Services
Department |
HK$1,764,000.00
|
December
2002
|
|
2 |
Contract No.: GE/2001/06
- LPM Project, Phase 2, Package A South Lantau Road, Slope No.: 10SW-C/C64 |
|
Toyo-Mulching System
on Soil and Rock Slope
- 311 sq m
|
Shun Yuen Construction
Co., Ltd.
CM Geotechnic Ltd.
|
Halcrow China Ltd.
Urbis Ltd.
|
Geotechnical Engineering
Office
|
HK$249,472.00
|
March
2003
|
|
3 |
Contract No.: SSK
319
Construction of Morning Trail for Jordan Valley Playground Phase 2
Stage 2 at Jordan Valley, Kowloon |
|
Toyo-Mulching System
on No Fines Concrete Slope - 284 sq m
|
Union Contractors
Ltd.
Wang Fu Construction Ltd.
|
Edaw Earthasia Ltd.
|
Architectural Services
Department |
HK$37,587.50
|
April
2003
|
|
4 |
Vegetation System
Work at Chung Chi Road
The Chinese University of Hong Kong
Slope No.: 7NE-C/C9 |
|
Hydromulching System
- 200 sq m
Toyo-Mulching System - 10 sq m
Soil Creat System - 50 sq m
|
Enpack (HK) Ltd.
|
Fugro (HK) Ltd.
|
The Chinese University
of Hong Kong
|
HK$100,000.00
|
November
2000
|
|
5 |
Ming Hua Tang, The
Chinese University of Hong Kong
Slope No.: 7NE-C/C56 |
|
Toyo-Mulching System
on
Soil Slope with Chunam Cover - 30 sq m
No Fines Concrete Surface - 35 sq m
Rock Surface - 35 sq m
|
Enpack (HK) Ltd.
|
Fugro (HK) Ltd.
|
The Chinese University
of Hong Kong
|
HK$20,000.00
|
April
2001
|
|
6 |
No. 9 Middle Gap Road,
Hong Kong
Slope Improvement Work for Residential Development |
|
Toyo-Mulching System
on Sprayed Concrete Slope - 585 sq m
Pit Planting in Tree Rings
|
Ever Construction
Co., Ltd.
|
Urbis Ltd.
|
Chinese Estates Group
|
HK$320,000.00
|
January
2001
|
|
7 |
Residential Development
at No. 27-29 South Bay Close, Repulse Bay, Hong Kong |
|
Toyo-Mulching System
with Root Hole and Climber on Sprayed Concrete Slope and Concrete
Buttress - 3,000 sq m
Eco-Bag
|
Chun Wo Construction
& Engineering Co., Ltd.
|
Edaw Earthasia Ltd.
|
Emperor Project Management
(HK) Ltd.
|
HK$1,700,000.00
|
November
1999
|
|
8 |
Contract No.: 99/8007
- Slope Improvement Work for Lamma Power Station and 275 KV Cable
Routes on Lamma Island |
|
Toyo-Mulching System
Sprayed on Concrete Slope - 500 sq m
Sprayed on No Fines Concrete Slope - 1,300 sq m
|
Paul Y. Construction
Co., Ltd.
Capture Construction Co., Ltd.
|
Edaw Earthasia Ltd.
|
The Hong Kong Electric
Co., Ltd.
|
HK$560,000.00
|
April
2000
|
|
9 |
Contract No.: SS F454
- Princess Margaret Hospital, Lai Kong Street, Lai King, N.T. |
|
Toyo-Mulching System
on Sprayed Concrete Slope
- 4,488 sq m
Eco-Bag
Geomat - 4,488 sq m
|
China Overseas Building
Construction Ltd.
|
Architectural Services
Department
|
Architectural Services
Department
|
HK$2,983,625.00
|
September
2000
|
|
10 |
Contract No.: 2/WSD/97
- Maintenance Term Contract, Vegetation Improvement Work to the Existing
Slope at Tai Tam Reservoir Road
Slope No.: 11SE-C/C694 |
|
Toyo-Mulching System
on Sprayed Concrete Slope - 785 sq m
Geomat - 785 sq m
|
Chun Wo Construction
& Engineering Co., Ltd.
|
Water Supplies Department
|
Water Supplies Department
|
HK$717,933.00
|
October
2000
|
|
11 |
Contract
No.: 97 of 1996 - Tiu King Ling Site Formation Work Vegetation Improvement
Work to Existing Slope |
|
Toyo-Mulching
System on Sprayed Concrete Slope - 606 sq m
Geomat - 606 sq m
|
China
State Construction Engineering (HK) Ltd.
|
N.A.
|
Hong
Kong Housing Authority
|
HK$393,900.00
|
July
2000
|
|
12 |
Contract
No.: GE/98/02 - Slope Improvement Work at Tai Po Road, Sham Shui Po
Slope No.: 11NW-B/C16 |
|
Toyo-Mulching System
on Sprayed Concrete Slope - 255 sq m
Geomat - 255 sq m
|
Kwan On Construction
Co., Ltd.
|
Geotechnical Engineering
Office
|
Geotechnical Engineering
Office
|
HK$180,000.00
|
August
2000
|
|
13 |
Contract No.: GE/99/18
- Slope No.: 11NW-D/C 330 & C548, SE of Tsoi Kung Po Secondary
School LPM Project, Phase 1, Package A |
|
Toyo-Mulching System
on Sprayed Concrete Slope - 100 sq m
|
Gammon Construction
Co., Ltd.
|
Halcrow China Ltd.
|
Geotechnical Engineering
Office
|
HK$130,000.00
|
December
2000
|
|
14 |
Contract No.: GE/99/21
LPM Project, Package D Landslip Preventive Works for Slopes, Kam Shan
Country Park
Tai Po Road
Slope No.: 7SW-D/C536 - 527 sq m
Slope No.: 7SW-D/C547 - 290 sq m
Slope No.: 7SW-D/C553 - 280 sq m
Clear Water Bay Road
Slope No.: 12SW-A/C125 - 68 sq m
Slope No.: 12NW-C/C92 - 136 sq m |
|
Toyo-Mulching System
on Sprayed Concete Slope - 1, 301sq m
Geomat - 1,301 sq m
|
Kin Shing Construction
Co., Ltd.
|
Binnie Black &
Veatch Hong Kong Ltd.
|
Geotechnical Engineering
Office
|
HK$882,000.00
|
December
2000
|
|
15 |
Contract
No.: 1/ WSD/ 00 (1) - Term Contract for Waterworks
District No. 1 - Hong Kong Island and Ap Lei Chau
Slope No.: 11SW-C/C322 |
|
Toyo-Mulching System
on Sprayed Concete Slope - 528 sq m
Geomat - 528 sq m
|
Chun Wo Construction
& Engineering Co., Ltd.
|
N.A.
|
Water Supplies Department
|
HK$750,000.00
|
December
2000
|
|
16 |
Contract No.: 10/HY/99
- Nam Fung Road, Shouson Hill
Slope No.: 11 SW-D/C110 - 237 sq m
Nam Long Shan Road
Slope No.: 15NW-B/C334 - 593 sq m
Slope No.: 15NW-B/C354 - 720 sq m
Slope No.: 15NW-B/C176 - 750 sq m
Stanley Gap Road
Slope No.: 15NW-A/C139 - 480 sq m
Tung Tau Wan Road
Slope No.: 15NE-C/C2 - 550 sq m
Shek On Road
Slope No.: 11SE-D/C104 - 850 sq m
Slope No.: 11NE-B/C57 - 320 sq m
Slope No.: 15NW-B/C76 - 388 sq m
Slope Near Catchpit SO 63 - 145 sq m
Slope Near Catchpit SO 61 - 150 sq m |
|
Toyo-Mulching
System on Sprayed Concrete and Rock Slope, total area - 5,183 sq m
|
Hung
Mau Realty & Construction Ltd.
|
Highways
Department
|
Highways
Department |
HK$7,876,215.00
|
March
2001
|
|
17 |
Contract
No.: 18/HY/98 - Hearlech Road
Slope No.: 11SW-C/C300 - 400 sq m
Stubbs Road
Slope No.: 11SW-D/C391 - 420 sq m
Tai Hang Road
Slope No.: 11SE-C/C123 - 650 sq m
Po Fu Lam
Slope No.: 11SW-A/C135 - 215 sq m
Slope No.: 11SW-A/C138 - 250 sq m
Price Road
Slope No.: 11SE-C/C166 - 500 sq m
Coombe Road
Slope No.: 10228C00160 - 350 sq m
Stewart Terrace
Slope No.: 11SW-D/CR241 - 340 sq m
Harlech Road
Slope No.: 15SW-C/C301 - 521 sq m |
|
Toyo-Mulching
System on Sprayed Concrete Slope, total area - 4,146 sq m
|
Chun
Wo Construction & Engineering Co., Ltd.
|
Highways
Department
|
Highways
Department |
HK$4,975,200.00
|
March
2001
|
|
18 |
Residental
Development at No. 20 Wai Fung Street, Ap Lei Chau |
|
Toyo-Mulching
On Sprayed Concrete Slope - 230 sq m
Geomat - 230 sq m
|
N.A.
|
Urbis
Ltd.
|
Nan
Fung Group
|
HK$282,250.00
|
April
2001
|
|
19 |
Contract
No.: HY/2000/03 - Footbridge Across Wong Chuk Hang Road Near Aberdeen
Sports Ground |
|
Toyo-Mulching
System on Sprayed Concete Slope - 243 sq m
Eco-Bag
|
Kwan
Kee Construction Co., Ltd.
|
Maunsell
Consultants Asia Ltd.
|
Highways
Department
|
HK$279,936.00
|
May
2001
|
|
20 |
Project No.: 067MC
- Public Health Laboratory Centre Proposed Landscape Treatment of
Slope at Cheung Sha Wan |
|
Toyo-Mulching System
on Sprayed Concrete Slope - 120 sq m
|
Shui On Construction
Co., Ltd.
|
N.A.
|
Architectural Services
Department
|
HK$112,320.00
|
December
2001
|
|
21 |
Contract No.: SS G328
- Design and Construction of Departmental Quarters at Lee On Road,
Kwun Tong |
|
Toyo-Mulching System
on Sprayed Concrete Slope
- 2, 000 sq m
Eco-Bag
Spray Colour
|
Hsin Chong - Taylor
Woodrow Joint Venture
|
Belt Collins Hong
Kong Ltd.
|
Highways Department |
HK$150,084.00
|
December
2001
|
|
22 |
Contract No.: SS G331
- Design and Construction of Departmental Quarters at Lai Chi Ling
Road, Lai King |
|
Toyo-Mulching System
on Sprayed Concrete Slope - 4,717 sq m
|
Dragages et Travaux
Publics (HK) Ltd.
|
N.A.
|
Architectural Services
Department
|
HK$1,464,523.00
|
April
2002
|
|
23 |
Chinese University
of Hong Kong
Proposed Slope Improvement Works to
Slope No.: 7NE-C/C3, 7NE-C/C3 & C282 |
|
Toyo-Mulching System
on Rock Slope - 268 sq m
|
Barbican Construction
Co., Ltd.
|
fugro (HK) Ltd.
|
The Chinese University
of Hong Kong
|
HK$307,800.00
|
December
2001
|
|
24 |
Contract No.: GE/2001/10
- LPM Project, Phase 2 Tai Lam Tunnel Road
Slope No.: 6SE-A/C131 - 2,182 sq m
Fei Ngo Shan Road
Slope No.: 7SE-C/C594 - 663 sq m |
|
Toyo-Mulching System
on Sprayed Concrete Slope - 2,845 sq m
Geomat - 2,845 sq m
|
Barbican Construction
Co., Ltd.
|
C M Wong and Associated
Ltd.
|
Geotechnical Engineering
Office
|
HK$1,449,728.00
|
March
2002
|
|
25 |
Contract No.: 1/Lands/02
Term Contract for Slope Maintenance and Improvement Works
Slope No.: 11SW-C/CR245
Mount Kellett Road - The Peak |
|
Toyo-Mulching System
on No Fines Concrete Slope - 31.86 sq m
|
Paul Y. Construction
Co., Ltd.
Dix Construction & Transportation Ltd.
|
N.A.
|
Lands Department
|
HK$24,372.90
|
December
2002
|
|
26 |
Proposed Residential
Development Man Kei Toi Sai Kung |
|
Toyo-Mulching System
on Soil Slope - 500 sq m
|
Sunley Engineering
& Construction Co., Ltd.
New Concepts Foundation Ltd.
|
Belt Collins Hong
Kong Ltd.
|
USI Property Management
Ltd.
|
HK$276,000.00
|
August
2003
|
|
27 |
Pennys Bay Gas Turbine
Power Station |
|
Toyo-Mulching System
on Shotcrete Slope - 1,130 sq m
|
Oriental Landscapes
Ltd.
|
Urbis Ltd.
|
China Light &
Power Co., (HK) Ltd.
|
HK$870,100.00
|
November
2003
|
|
28 |
Green Area Formation
at R.B.L. 1138, Wong Ma Kok Road, Stanley,Hong Kong |
|
Toyo-Mulching System
286sq m
Geomat - 500 sq m
Eco-Bag
|
Chun Sing Engineering
Co., Ltd.
|
Parsons Brinckerhoff
(Asia) Ltd.
|
Regal Hotels International
Holdings Ltd.
|
HK$147,000.00
|
July
2003
|
|
29 |
Contract No.: CC404-Mei
Foo Station |
|
Toyo-Mulching System
130sq m
|
Kier-Zen Pacific
Joint Venture
|
Hyder Consultant
Ltd.
|
Kowloon Canton Railway
Corporation
|
HK$278,584.00
|
June
2004
|
|
30 |
Yeung UK Tsuen, Ho
Pui Tsuen, Mun Hau Tsuen |
|
Toyo-Mulching System
250sq m
|
Kenfull Engineering
Co., Ltd.
|
Wda Wailee Design
Architects Ltd. / CT & Associates (HK) Ltd.
|
Architectural Services
Department
|
HK$175,000.00
|
July
2004
|
|
31 |
Contract No.: AL K328
- Slope Improvement Programme Phase IV, Package 3 |
|
Toyo-Mulching System
25sq m
|
Ngai Tat Construction
Co., Ltd.
|
N.A.
|
Architectural Services
Department
|
HK$56,000.00
|
May
2004
|
|
32 |
Contract No.: GE/2002/05
Feature No.: 11NW-D/C44
Behind Lok Man San Tsuen, Kowloon |
|
Toyo-Mulching System
350 sq m
|
Yick Hing Construction
Co., Ltd.
Green Rank Ltd.
|
Binnie Black &
Veatch Hong Kong Ltd.
|
Geotechnical Engineering
Office
|
HK$310,500.00
|
December
2004
|
|
33 |
Contract No. HC068-02132
- HKU - Flora Ho Sports Centre |
Photo |
Toyo-Mulching System
- 742 sq m
Eco-Bag
|
Hanison Construction
Co., Ltd.
|
ADI Ltd.
|
Hong Kong University
|
HK$288,090.00
|
June
2005
|
|
34 |
Kellett
View Townhouse Renovation Works |
|
Toyo-Mulching
System 400 sq m
Geo-Net
|
Tysan
Building Construction Co., Ltd.
|
Map
|
Kellett View Townhouse
|
HK$300,000.00
|
January
2007
|
|
35 |
Contract
No.:HEC No. 038013 - Additional Transmission System for Lamma Power
Station
275kV Cable Route From Lamma Island to Cyberport N2 Landing Point |
|
Toyo-Mulching
System 316 sq m
Geo-Net
Planting Work
|
Kaden
Construction Ltd.
|
Maunsell
Consultants Asia Ltd.
Edaw Earthasia Ltd. |
Hong Kong Electric
|
HK$309,038.00
|
Onging
|
|