Project |
Description
of Work |
Main
Contractor |
Consultant
/
Landscape Architect |
Client |
Contract
Sum |
Completion
Date
|
|
1 |
Contract
No. 27/WSD/90 - Improvement Work to Junk Bay, Watering System |
|
Hydrseeding
- 25,000 sq m
|
Lam
Woo Construction Co., Ltd.
|
Maunsell
Consultants Asia Ltd.
|
Water
Supplies Department
|
HK$240,000.00
|
June
1994
|
|
2 |
Contract
No.: GE/93/03 - Stabilization Works to Slope at Siu Sai Wan |
|
Tree
Seed Hydroseeding - 11,000 sq m
Topsoil Mix |
Penta-Ocean
Construction Co., Ltd.
|
Geotechnical
Engineering Office
|
Geotechnical
Engineering Office
|
HK$390,000.00
|
March
1996
|
|
3 |
Proposed
Residential Beacon Hill Kowloon Site Formation Contract (Phase 2) |
|
Hydroseeding
- 60,000 sq m
|
China
State Construction Engineering (HK) Ltd.
Sang Hing Civil Contractors Co., Ltd.
|
Maunsell
Consultants Asia Ltd.
|
Sino
Land Co., Ltd.
|
HK$420,000.00
|
June
1996
|
|
4 |
Contract
No.: HY/94/20 - Smithfield Extension - The Link & Pofulam Open
Space |
|
Hydroseeding
- 15,450 sq m
Hydromulching System - 2,000 sq m
Toyo-Mulching System - 200 sq m
Soil Creat System - 40 sq m
Kangaroo Mat II - 1,500 sq m
Harishiba Kangaroo Mat - 500 sq m
Landscape Planting
Pit Planting
Soiling
Turfing - 500 sq m
Tree Transplant
Maintenance
|
Paul
Y. Construction Co., Ltd.
Yee Sun Gardens
|
Pypun
Engineering Consultants Ltd./
Team 73 Ltd.
|
Highways
Department
|
HK$2,071,261.00
|
April
1999
|
|
5 |
Contract
No.: 49/WSD/91 - Ma On Shan Salt, Water Pumping Station |
|
Hydroseeding
1,500 sq m
Turfing 1,500 sq m
|
Law
Chi Yip Construction Ltd.
|
Maunsell
Consultants Asia Ltd.
|
Water
Supplies Department
|
HK$180,000.00
|
May
1994
|
|
6 |
Contract
No.: EP/SP/12/92 - Development and Management of North East NewTerritories
(NENT) Landfill |
|
Hydroseeding
- 360,000 sq m
|
Dickki
Civil Eng. Co.
. |
N.A.
|
Environmental
Protection Department
|
HK$650,000.00
|
December
1999
|
|
7 |
Contract
No.: GE/97/04 - Upgrading of Retaining Walls, Cut Slopes, Fill Slopes
and Rocks Slopes in Hong Kong Island, Kowloon and N.T. Section 1 to
Section 14 |
|
Tree
seed Hydroseeding - 20,000 sq m
|
Kin
Shing Construction Co., Ltd.
|
Maunsell
Consultants Asia Ltd.
|
Geotechnical
Engineering Office
|
HK$250,000.00
|
April
1998
|
|
8 |
Contract
No.: 7/WSD/96 - Butterfly Valley Primary Service Reservoir |
|
Planting
Hydroseeding - 30,000 sq m
|
Gammon
Skanska Ltd.
|
Binnie
Black & Veatch Hong Kong Ltd.
|
Water
Supplies Department
|
HK$207,925.00
|
April
2003
|
|
9 |
Contract
No.: 20/WSD/97 - Tank Kwai Tsuen - Yuen Long |
|
Tree
Transplanting
Planting
Hydroseeding - 40,000 sq m |
China
Overseas Civil Eng. Ltd.
|
Binnie
Black & Veatch Hong Kong Ltd.
|
Water
Supplies Department
|
HK$350,000.00
|
March
1999
|
|
10 |
Contract
No.: CV/97/03 - Pak Shek Kok Reclamation for Dumping, Stage II |
|
Hydroseeding
- 35,000 sq m
|
Dickson
Construction Co., Ltd.
|
Maunsell
Consultants Asia Ltd.
|
Civil
Engineering Department
|
HK$250,000.00
|
May
1996
|
|
11 |
Contract
No.: GE/99/19 - LPM Project, Phase 1, Package B |
|
Hydroseeding
- 4,000 sq m
Planting
|
A
Quality Engineering Co., Ltd.
|
N.A.
|
A
Quality Engineering Co., Ltd.
|
HK$100,000.00
|
January
2000
|
|
12 |
Contract
No.: MTR 798 - Lai King Station SWA Slope Reinstatement Work |
|
Hydroseeding
- 55,000 sq m
Pit Planting
|
Luen
Cheong Tai Construction Co., Ltd.
|
N.A.
|
Luen
Cheong Tai Construction Co., Ltd.
|
HK$60,000.00
|
March
2002
|
|
13 |
Contract
No.: 2 of 1999 - Landslip Preventive Works at Tiu Keng Leng |
|
Hydroseeding
- 62,972 sq m
|
Express
Building Contractor Co., Ltd.
|
Hyder
Consulting Ltd.
|
Hong
Kong Housing Authority
|
HK$290,000.00
|
August
2000
|
|
14 |
Contract
No.: CC-601 - Civil and Infrastructure Works for Kam Tin Depot |
|
Landscape
Planting
Planting
Tree Transplant
Topsoil
Hardwork - Tree Grill, Tree Guard, Root Barrier
Kangaroo Mat I - 300 sq m
Hydroseeding - 200,000 sq m
Maintenance
|
Zen
Pacific-China State-Ngo Kee Joint Venture
|
Parsons
Brinckerhoff (Asia) Ltd.
ACL Asia Clouston
|
Kowloon
Canton Railway Corporation
|
HK$9,609,791.70
|
December
2005
|
|
15 |
Contract
No.: EP/SP/12/92 - Development and Management of North East New Territories
(NENT) Landfill |
|
Hydroseeding
- 360,000 sq m
|
N.A.
|
N.A.
|
Far
East Landfill Technologies Ltd.
|
HK$1,800,000.00
|
September
2001
|
|
16 |
Contract
No.: YL/42/98 - Tung Chung Development Phase IIA - Infrastructure |
|
Hydroseeding
- 23,000 sq m
|
Hop
Tai Construction Co., Ltd.
|
N.A.
|
Territory
Development Department
|
HK$120,000.00
|
June
2000
|
|
17 |
Contract
No.: GE/95/22 - Rehabilitation of Lamma Quarry Landscape Strategy
for Detailed Design of Area C & D |
|
Hydroseeding
- 300,000 sq m
|
NFY
Nursery Ltd.
|
Urbis
Ltd.
|
Geotechnical
Engineering Office
|
HK$1,100,000.00
|
November
2000
|
|
18 |
Contract
No.: GE/99/20 - LPM Project, Phase I, Package C |
|
Hydroseeding
- 31,461 sq m
Landscape Planting
Planting
Maintenance
|
Hintak
Construction Co., Ltd.
|
Fugro
(HK) Ltd.
|
Geotechnical
Engineering Office
|
HK$506,858.00
|
August
2000
|
|
19 |
Contract
No.: GE/2000/13 - LPM Project, Phase I, Package M |
|
Hydroseeding
- 14,835 sq m
Flower Seed Hydroseeding - 9,098 sq m
Landscape Planting
Pit Planting
Maintenance |
Enpack
(HK) Ltd.
|
Maunsell
Consultants Asia Ltd.
EDAW Earthasia Ltd.
|
Geotechnical
Engineering Office
|
HK$349,999.00
|
December
2004
|
|
20 |
Contract
No.: 100 of 1998 - Term Contract for Slope Maintenance and Improvement
Works for Region (D) (1999-2001) |
|
Hydroseeding
- 18,000 sq m
|
Kin
Shing Construction Co., Ltd.
|
N.A.
|
Hong
Kong Housing Authority
|
HK$170,391.00
|
March
2001
|
|
21 |
Contract
No.: EP/SP/10/91 - SENT Landfill Phase 3 Restoration Landscape Works |
|
Hydroseeding
- 83,000 sq m
Planting
Maintenance
|
Green
Valley Landfill Ltd.
|
Maunsell
Consultants Asia Ltd.
Urbis Ltd.
|
Environmental
Protection Department
|
HK$625,637.00
|
May
2001
|
|
22 |
Contract
No.: GE/2000/01
LPM Project, Phase I, Package L |
|
Hydroseeding
- 5,551 sq m
Pit Planting
Soiling
|
Kwan
On Construction Co., Ltd.
|
Urbis
Ltd.
|
Geotechnical
Engineering Office
|
HK$1,583,113.00
|
February
2006
|
|
23 |
Contract
No.: GE/93/14 - Rehabilitation of Shek O Quarry - Phase III |
|
Hydroseeding
- 26,200 sq m
|
Shek
O Quarry Ltd.
|
Urbis
Ltd.
|
Geotechnical
Engineering Office
|
HK$185,616.00
|
July
2001
|
|
24 |
Contract
No.: WK/28/98 - West Kowloon Reclamation |
|
Hydoseeding
- 300,000 sq m
|
Chun
Wo Construction & Engineering Co., Ltd.
|
Mott
MacDonald Hong Kong Ltd.
|
Territory
Development Department
|
HK$950,000.00
|
November
2001
|
|
25 |
Contract No.: GE/2001/10
- LPM Project, Phase 2, Package J |
|
Hydroseeding - 6,304
sq m
Planting
Maintenance
|
Barbican Construction
Co., Ltd.
|
C. M. Wong &
Associates Ltd.
|
Geotechnical Engineering
Office
|
HK$2,500,000.00
|
May
2002
|
|
26 |
Contract No.: EP/SP/10/91
Development and Management of South-East New Territories (SENT) Landfill
- Fourth Phase Restoration |
|
Hydroseeding - 111,014
sq m
Planting
Maintenance |
Green Valley Landfill
Ltd.
|
Maunsell Consultants
Asia Ltd.
Urbis Ltd.
|
Environmental Protection
Department
|
HK$535,261.80
|
April
2002
|
|
27 |
Contract No.: GE/2001/27
- LPM Project, Phase 2, Package G |
|
Hydroseeding - 17,000
sq m
Planting
Maintenance
|
Fuk Shing Engineering
Co., Ltd.
|
Halcrow China Ltd.
Urbis Ltd.
|
Geotechnical Engineering
Office
|
HK$980,000.00
|
October
2002
|
|
28 |
Disney Site Formation |
|
Hydroseeding - 114,000
sq m
|
China State Construction
Engineering (HK) Ltd.
|
Maunsell Consultants
Asia Ltd. /
Edaw Earthasia Ltd.
|
Asia Landscaping
Ltd.
|
HK$600,000.00
|
|
|
29 |
Tung Chung Station
Development Package Two - Phase 2a (C420a) |
|
Hydroseeding - 11,000
sq m
Soiling
|
Hip Hing - Hanison
Joint Venture
|
Belt Collins Hong
Kong Ltd.
|
Heng Kei Properties
Ltd.
|
HK$164,443.00
|
December
2002
|
|
30 |
Contract No.: CV/2000/09
- Infrastructure for Penny¡¯s Bay Development ¨C Contract 1 |
|
Hydroseeding - 300,000
sq m
|
China State Construction
Engineering (HK) Ltd.
Asia Landscaping Ltd.
|
Maunsell Consultants
Asia Ltd.
Edaw Earthasia Ltd.
|
Civil Engineering
Department
|
HK$1,000,000.00
|
February
2003
|
|
31 |
Contract No. DC 98/04
- Kam Tin |
|
Hydroseeding - 116,330
sq m
Soiling - 89,449 sq m
|
Chiu Hing Construction
& Transportation Co., Ltd.
Po Wing (International) Construction Ltd.
|
Maunsell Consultants Asia Ltd.
|
Drainage Services Department
|
HK$1,540,000.00
|
January 2004
|
|
32 |
Contract
No.: GE/2001/04 - LPM Project, Phase 2, Package C
|
|
Hydroseeding
- 27,500 sq m
Planting
Planter Tube
|
Carrier Construction Co., Ltd.
|
Mott
Connell
Urbis Ltd.
|
Geotechnical Engineering Office
|
HK$479,361.00
|
March 2006
|
|
33 |
Contract
No.: GE/2000/09 - LPM Project, Phase I, Package L Slope No. 11SW-A/C
173, Po Shan |
|
Planting
Hydroseeding - 13,600 sq m
Planter Tube
|
Tonic Engineering & Construction Co., Ltd.
|
Fugro (HK) Ltd.
Urbis Ltd.
|
Geotechnical Engineering Office
|
HK$126,800.00
|
October 2003
|
|
34 |
Rehabilitation of
Shek O Quarry |
|
Hydroseeding - 60,000
sq m
|
Pioneer Hanson Co.,
Ltd.
|
Urbis Ltd.
|
Geotechnical Engineering
Office
|
HK$282,000.00
|
July 2004
|
|
35 |
Contract No.: GE/2002/17
- LPM Project, Phase 2, Package G |
|
Hydroseeding - 21,392
sq m
Planting
Plante Tube
Eco-Green on Rock Slope - 200 sq m
Toyo-Mulching on Concrete Slope - 300 sq m
|
Hsin Chong Construction
Co., Ltd.
|
Halcrow China Ltd.
Urbis Ltd.
|
Geotechnical Engineering
Office
|
HK$911,430.00
|
October 2004
|
|
36 |
Pennys Bay Gas Turbine
Power Station |
|
Hydroseeding - 10,370
sq m
|
Oriental Landscapes
Ltd.
|
Urbis Ltd.
|
China Light &
Power Co., (HK) Ltd.
|
HK$62,220.00
|
November 2004
|
|
37 |
Development And Management
of WEST New Territories ( WENT) Landfill |
|
Hydroseeding - 20,400
sq m
|
Swire Sita Waste
Services Ltd.
|
N.A.
|
Environmental Protection
Department
|
HK$83,717.00
|
March 2005
|
|
38 |
Contract No.: HY/2003/01
- Route 8 - Lai Chi Kok Viaduct |
|
Hydroseeding - 75,356
sq m
|
Classic Engineering Co., Ltd.
|
Maunsell Consultants Asia Ltd.
|
Highways Department
|
HK$1,975,000.00
|
Ongoing
|
|
39 |
Contract No.: HY/2003/01
- Route 8 - Lai Chi Kok Viaduct |
|
Hydroseeding - 75,356
sq m
|
Classic Engineering
Co., Ltd.
|
Maunsell Consultants
Asia Ltd.
|
Highways Department
|
HK$1,975,000.00
|
|
|
40 |
Contract No.: 00/8016
- Lamma Power Station Extension - Site Formation Hydroseeding Works
to existing Bund Wall |
|
Hydroseeding - 11,820
sq m
|
Paul Y. - Penta-Ocean
Joint Venture
|
N.A.
|
China Light &
Power Co., (HK) Ltd.
|
HK$76,830.00
|
July 2004
|
|
41 |
Contract No.: HK12/02
- Central Rclamation Phase III |
|
Planting
Hydroseeding - 121,473 sq m
Maintenance |
Leighton-China State-Van Oord Joint Venture
|
Atkins China Ltd.
|
Territory Development Department
|
HK$4,241,174.10
|
Ongoing
|
|
42 |
KCRC Contract No.
1/ICP/2004 - Noise Mitigation Measures at Sheung Shui - Stage 1 Works |
|
Hydroseeding 600 sq m
|
Wai Kee (C&T) - Leader Joint Venture
|
|
Kowloon Canton Railway Corporation
|
HK$4,500.00
|
October 2005
|
|
43 |
Contract No.: SS A363
- Construction of District Open Space |
|
Hydroseeding with
tree seed
6,000 sq m
|
JDC Corporation
|
Architectural Services
Department
|
Architectural Services
Department
|
HK$48,000.00
|
July 1996
|
|
44 |
Contract No.: 1/WSD/03/(H)
- Slope Upgrading Works for Feature No. 11SE-A/C553 Tin Hau Temple
Road Garden No.3 |
|
Hydroseeding Work
500 sq m
|
BIS Water Works Co.,
Ltd.
Chun Wo Construction and Engineering Ltd.
|
Maunsell Consultants
Asia Ltd.
|
Water Services Department
|
HK$4,200.00
|
November 2006
|
|
45 |
Contract No.: GE/93/03
- Stabilization Works to Slope at Siu Sai Wan |
|
Tree Seed Hydroseeding
- 11,000 sq m
Topsoil Mix
|
Penta-Ocean Construction
Co., Ltd.
|
Geotechnical Engineering
Office
|
Geotechnical Engineering
Office
|
HK$390,000.00
|
March
1996
|
|
46 |
Contract No. EP/SP/9/91
- WENT Landfill Management Vegetation Work on Intermedicate Cap |
|
Hydroseeding 200,000
sq m
|
Swire BFI Waste Services
Ltd.
|
Binnie Consultants
Ltd.
|
Environmental Protection
Department
|
HK$1,600,000.00
|
July
1996
|
|
47 |
Contract No. HY/93/38
- Ting Kau Bridge & Approach Viaduct |
|
Hydroseeding 150,000
sq m
|
Ting Kau Contractors
Joint Venture
|
Route 3 Consortium
|
Highways Department
|
HK$900,000.00
|
October
1997
|
|
48 |
Route 3 Country Park
Section From Tuen Mun Rd. to South Portal |
|
Hydroseeding 250,000
sq m
|
Dragages et Travaux
Publics (HK) Ltd.
|
Route 3 Consortium
|
Route 3 Consortium
|
HK$1,800,000.00
|
September
1995
|
|
49 |
Contract No.: GE/97/04
- Upgrading of Retaining Walls, Cut Slopes, Fill Slopes and Rocks
Slopes in Hong Kong Island, Kowloon and N.T. Section 1 to Section
14 |
|
Tree seed Hydroseeding
- 20,000 sq m
|
Kin Shing Construction
Co., Ltd.
|
Maunsell Consultants
Asia Ltd.
|
Geotechnical Engineering
Office
|
HK$250,000.00
|
April
1998
|
|
50 |
Contract No.: 5/WSD/96
- Aqueduts between Tai Po & Butterfly Valley |
|
Hydroseeding - 2,976
sq m
Hydroseeding with tree seeds - 1,519 sq m
|
Leighton Kumagai
Joint Venture
|
Maunsell Consultants
Asia Ltd.
|
Water Supplies Department
|
HK$20,005.00
|
November 2001
|
|
51 |
Oi Ling Ting Quarry,
Zhu Hai, China |
|
Hydroseeding 7,000
sq m
Pit Planting
Installation of Irrigation System
|
K. Wah Quarry Co.,
Ltd.
|
N.A.
|
K. Wah Quarry Co.,
Ltd.
|
HK$160,000.00
|
July 1993
|
|
52 |
Contract No.: GE/99/19
- LPM Project, Phase 1, Package B |
|
Hydroseeding - 4,000
sq m
Planting
|
A Quality Engineering
Co., Ltd.
|
N.A.
|
Geotechnical Engineering
Office
|
HK$100,000.00
|
January 2000
|
|
53 |
Contract No.: 2 of
1999 - Landslip Preventive Works at Tiu Keng Leng |
|
Hydroseeding - 62,972
sq m
|
Express Building
Contractor Co., Ltd.
|
Hyder Consulting
Ltd.
|
Hong Kong Housing
Authority
|
HK$290,000.00
|
August
2000
|
|
54 |
Contract No.: GE/2000/13
- LPM Project, Phase I, Package M |
|
Hydroseeding - 14,835
sq m
Flower Seed Hydroseeding - 9,098 sq m
Landscape Planting
Pit Planting
Maintenance
|
Enpack (HK) Ltd.
|
Maunsell Consultants
Asia Ltd.
EDAW Earthasia Ltd.
|
Geotechnical Engineering
Office
|
HK$349,999.00
|
December
2004
|
|
55 |
Contract No.: GE/2000/01
- LPM Project, Phase I, Package L |
|
Hydroseeding - 5,551
sq m
Pit Planting
Soiling
|
Kwan On Construction
Co., Ltd.
|
Urbis Ltd.
|
Geotechnical Engineering
Office
|
HK$1,583,113.00
|
February
2006
|
|
56 |
Contract No. 155 of
1999 - Kwai Chung Estate Phase 3 |
|
Hydroseeding with
Tree Seed - 1,037m2
|
Gammon Construction
Co., Ltd.
|
N.A.
|
Hong Kong Housing
Authority
|
HK$7,983.67
|
September2001
|
|
57 |
Contract No.: HY/2000/02
- Castle Peak Road Improvement Between Area 2 and Ting Kau, Tsuen
Wan |
|
Hydroseeding - 24,663
sq m
Tree Seed Hydroseeding - 17,828 sq m
Tree Transplant
Landscape Planting
Pit Planting
Maintenance
|
China State Construction
Engineering (HK) Ltd.
|
Maunsell Halcrow
Joint Venture/
ACLA
|
Highways Department
|
HK$3,984,421.50
|
July 2006
|
|
58 |
Contract No.: GE/2001/10
- LPM Project, Phase 2, Package J |
|
Hydroseeding - 6,304
sq m
Planting
Maintenance
|
Barbican Construction
Co., Ltd.
|
C. M. Wong &
Associates Ltd.
|
Geotechnical Engineering
Office
|
HK$2,500,000.00
|
May 2002
|
|
59 |
Lei Yue Mun Phase
1 P.R.H |
|
Hydroseeding with
Tree Seeds - 1,000 sq m
|
Paul Y. ITC General
Contractors Ltd.
|
|
N.A.
|
HK$11,000.00
|
Ongoing
|
|
60 |
Contract No.: 48 of
1999 - Site Formation Works for Public Housing Development at Tung
Tau Cottage Area |
|
Hydroseeding - 8,500
sq m
|
Kin Shing Construction
Co., Ltd.
|
|
Hong Kong Housing
Authority
|
HK$60,000.00
|
Ongoing
|
|
61 |
Contract No.: GE/2001/27
- LPM Project, Phase 2, Package G |
|
Hydroseeding - 17,000
sq m
Planting
Maintenance
|
Fuk Shing Engineering
Co., Ltd.
|
Halcrow China Ltd.
Urbis Ltd.
|
Geotechnical Engineering
Office
|
HK$980,000.00
|
October 2002
|
|
62 |
Lei Muk Shue Estate
Phase III |
|
Hydroseeding with
Tree Seeds - 914 sq m
|
Shui Wing Construction
Co., Ltd.
|
|
Hong Kong Housing
Authority
|
HK$6,215.20
|
Ongoing
|
|
63 |
Contract No.: HKHA
20020001 - Redevelopment of Shek Lei Estate Phase 10 |
|
Hydroseeding with
Tree Seeds - 700 sq m
|
Tapbo Civil Engineering
Co., Ltd.
|
|
Hong Kong Housing
Authority
|
HK$6,300.00
|
Ongoing
|
|
64 |
Contract No.: GE/2000/13
- LPM Project, Phase I, Package M |
|
Hydroseeding - 14,835
sq m
Flower Seed Hydroseeding - 9,098 sq m
Landscape Planting
Pit Planting
Maintenance
|
Enpack (HK) Ltd.
|
Maunsell Consultants
Asia Ltd.
EDAW Earthasia Ltd. |
Geotechnical Engineering
Office
|
HK$349,999.00
|
December 2004
|
|
65 |
Lower Level PFA Logoons
at Tsang Tsui |
|
Hydroseeding 13,000
sq m
|
Pollard Construction
Co., Ltd.
|
Mouchel Asia Ltd.
|
China Light &
Power Co., (HK) Ltd.
|
HK$110,000.00
|
September
2001
|
|
66 |
Contract No.: EP/SP/10/91
Development and Management of South-East New Territories (SENT) Landfill
- Temporary Area Landscape Restoration |
|
Hydroseeding - 70,000
sq m
|
Green Valley Landfill
Ltd.
|
Maunsell Consultants
Asia Ltd.
Urbis Ltd.
|
Environmental Protection
Department
|
HK$400,000.00
|
December
1999
|
|
67 |
Putting Green at Tai
Po Golf Driving Range |
|
Hydroseeding - 180,000
sq m
|
Hong Kong Landfill
Restoration Group Ltd. |
N.A.
|
Environmental Protection
Department
|
HK$684,000.00
|
January
2000
|
|
68 |
KCRC-West
Rail Phase I
Contract No. DB-320 - Kwai Tsing Tunnels |
|
Planting
Tree Purning
Hydroseeding - 1,450 sq m |
Dragages
- Zen Pacific Joint Venture |
Atkins
China Ltd.
|
Kowloon
Canton Railway Corporation
|
HK$52,565.00
|
February
2003
|
|
69 |
Contract
No.: HY/2002/05
Route 9 Advance Works |
|
Hydroseeding
- 3,480 sq m
Grass Cutting - 6,880 sq m
|
Paul
Y. Construction Co., Ltd.
|
Maunsell
- Hyder JV
|
Highways
Department
|
HK$2,045,910.00
|
August
2005
|
|
70 |
Contract No. 31/WSD/02
Ground Investigation and Preventive Mainteance Works for
Water Supplies Department(WSD) Slopes, 2002-2005 (Package 1) |
|
Hydroseeding with
tree seeds with Soil Guard
|
Gammon Skanska Ltd.
Newson Const. Eng. Ltd.
|
Maunsell Consultants
Asia Ltd.
|
Water Supplies Department
|
HK$100,000.00
|
October
2004
|
|
71 |
Lot No. 417 &
389 R.P. in D.D. 399 Casam Beach, Ting Kau |
|
Hydroseeding
- 2,000 sq m
Installation of Enrolmat 18- 2,000 sq m
|
Kinko
Construction Co., Ltd.
|
N.A.
|
Sunnic
Engineering Ltd.
|
HK$49,500.00
|
May
2006
|
|
72 |
Contract
No. TK60/03
Tesung Kwan O Development
Footbridge Linking Areas 45 & 55A |
|
Hydroseeding
22,000 sq m
|
Barbican
Construction Co., Ltd.
|
Maunsell
Consultants Asia Ltd.
|
Civil
Engineering Department
|
HK$97,388.70
|
Ongoing
|
|